Monday, April 14, 2008
Power Surge From Local Power Supplier
It will be very frustrating if a problem arises from an uncontrollable source. For example, today, there was a power surge which came from the local power supply. It happened so fast and we felt the power interruption in a split second. Immediately, I looked through the CCTV and checkout what was happening from inside my office. The plant operators were running here and there checking the valves, pumps and other equipments. Three units of boilers which are supposed to supply steam to the plants shut off. The boiler man worked very hard to start up the boiler step by step. My colleague, a charge man, swiftly checked the LV (Low Voltage) room to checked on any problem or tripping on our site. Fortunately, everything was in perfect order. It was the 1 second power surge that affected us and definitely resulted in a terrible downtime to our production.
How to avoid such downtime?
For our side, we cannot avoid this. It must be control from the local power supplier, in our case, Tenaga Nasional Berhad (TNB). They must ensure their local power station is performing well and delivering sufficient power to surrounding factories and plants. Well, that's one kind of downtime that is very costly and unavoidable. A problem that is beyond our control.
Thursday, April 10, 2008
Manchester - Successful Contractor Management 2008
Dear Engineer
Join us at this year’s “Successful Contractor Management 2008” conference on the 20th and 21st May 2008 in Manchester. Effective contractor management is an essential issue today within maintenance management and technical projects. Ensuring your contractors meet Health & Safety standards is critical; getting the most out of your contractual relationships can be challenging; guaranteeing trained, competent and professional contractors problematic; and, measuring contractor performance is both complex and time consuming. And that’s just scratching the surface. If you also consider key topics like risk management, training, partnership models, planning and scheduling, contractual monitoring and IT it’s hardly surprising that the issue of contractor management is becoming increasingly important.
This conference will cover these topics, and more, and will give you all the tools and techniques you need to overcome these challenges. With best practice case studies from Halliburton, London Underground, Merck, OMV, Ontario Power Generation and Rolls-Royce this is a once in a lifetime chance to learn from those at the “coal face” of contractor management. You will also hear from the contractors themselves, getting their essential view on issues like relationship building, health and safety and performance measurement.
To download the conference brochure, and for more information please go to www.tacook.co.uk/cm2008
Packed with networking opportunities where you can thrash out your own challenges with the experts, this event offers you the most comprehensive platform to discuss these crucial issues.
You can also benefit form attending a pre-conference workshop. Gain a more comprehensive view of the individual issues being addressed, in a relaxed and informative environment. The workshops available at this event are:
Workshop A: Leading and Motivating Contracted Crews
Workshop B: Creating Value: Contract Management – A Wider View
For more information or to register please visit www.tacook.co.uk/cm2008 or contact the events team at info@tacook.com or +44 (0) 121 616 0190.
We look forward to meeting you in Manchester.
Kind regards,
Patricia Clemas
Events & Marketing Manager
T. A. Cook Conferences
Monday, April 7, 2008
Fabrication of Pressure Vessels
The following texts are the description of the videos above that came along with the video in youtube.com:
A pressure vessel is a closed, rigid container designed to hold gases or liquids at a pressure different from the ambient pressure. The end caps fitted to the cylindrical body are called heads.
In addition to industrial compressed air receivers and domestic hot water storage tanks, other examples of pressure vessels are: diving cylinder, recompression chamber, distillation towers, autoclaves and many other vessels in mining or oil refineries and petrochemical plants, nuclear reactor vessel, habitat of a space ship, habitat of a submarine, pneumatic reservoir, hydraulic reservoir under pressure, rail vehicle airbrake reservoir, road vehicle airbrake reservoir and storage vessels for liquified gases such as ammonia, chlorine, propane, butane and LPG.
In the industrial sector, pressure vessels are designed to operate safely at a specific pressure and temperature, technically referred to as the "Design Pressure" and "Design Temperature". A vessel that is inadequately designed to handle a high pressure constitutes a very significant safety hazard. Because of that, the design and certification of pressure vessels is governed by design codes such as the ASME Boiler and Pressure Vessel Code in North America, the Pressure Equipment Directive of the EU (PED), Japanese Industrial Standard (JIS), CSA B51 in Canada, AS1210 in Australia and other international standards like Lloyd's, Germanischer Lloyd, Det Norske Veritas, Stoomwezen etc.
Sunday, April 6, 2008
Room Temperature Superconducting Material
Instead of super-cooling the material, as is necessary for conventional superconductors, the new material is instead super-compressed. The researchers claim that the new material could sidestep the cooling requirement, thereby enabling superconducting wires that work at room temperature.
Continue reading the full article here.
Impressive Resume Formats to Get You A Job
Saturday, April 5, 2008
National Chemical Engineers Symposium (NACES) 2008 in University Putra Malaysia
What is NACES?
National Chemical Engineers Symposium (NACES) is an annual gathering for all chemical engineering undergraduates from both public and private universities from all over Malaysia. This program can enhance the integration among chemical engineering undergraduates from different races. Apart from that, this program can provide exposure on the issues and challenges faced by chemical engineers in the era of globalization in their effort to develop the country.
In year 2005, NACES was held by Universiti Malaya (UM) in collaboration with Institute of Chemical Engineers Malaysia (IJKM). In year 2006, Universiti Teknologi PETRONAS (UTP) became the host for this program. Last year, NACES 2007 was held successfully in Universiti Teknologi Malaysia (UTM).
Objectives
There are all together 4 very good objectives for NACES 2008. The objectives are as follows:
2. To draw interest and concern of the undergraduates over the importance of chemical and petroleum-based industries, and highlight chemical and petroleum engineers as potential driving force to the country’s development.
3. To create a venue for all universities in Malaysia to gather their thoughts and ideas for enhancement of our future as chemical engineers.
4. To provide an opportunity for participants and committee members from various social backgrounds to interact with each other and build new friendships.
Theme
The key to restoring climate stability is shifting from a fossil-fuel- based energy economy to one based on renewable sources of energy and hydrogen. The good news is that this shift is well underway. The bad news is that it may not be happening fast enough to avoid a climate- disrupting buildup of pollution.
The burning of coal, the dirtiest and most carbon-intensive fossil fuel, peaked in 1996 and has dropped by 6% since then. This historical peak marked the first decline in the use of a fossil fuel. It may be followed by a similar peak in oil use within the next five to 15 years. In contrast, renewables, starting from a small base, are growing at an extraordinary pace. Worldwide, wind electric generation grew by 32% a year from 1995 to 2001. In 2001, it grew by a robust 36%. And in the United States, wind electric generating capacity jumped by a phenomenal 66% in 2001.
Continue reading about the theme here.I seriusly urge junior chemical engineer to attend this symposium for to gain more exposure on the industry. Personally, I've attended the previous NACES 2007 hosted by the Faculty of Chemical and Natural Resources Engineering (FKKSA), UTM as a judge for the forum/debate and a workshop moderator. I can observed students actively participating and discussing throughout the session. It was a great event. I'm sure that students attending any NACES program will gain valuable precious input from the event. However, I think it is good if they can include some sort of process or production plant tour in their agenda. It will be really good if the students can see the actual distillation column, heat exchanger, cooling tower, boiler, piping, pump, understand why NPSH is very important, and learn a lot more. Well, that purely depends on the organizing committee. I'm sure they've work so hard to plan and make the whole program perfectly realized. If only there are companies in our industry who can allow students to conduct a brief site visit, that would be very lovely.
Registration deadline is at 11th April while payment are expected to be completed before 18th April. Fees are RM70 and each university are only allowed to send maximum 30 representatives.
For further informations, please drop by their official website: http://eng.upm.edu.my/naces2008/
Download NACES 2008 brochures here.
Some Problems We Find in A Processing & Production Plant
So, how can you get them? You'll actually get them when you work and experience those problems yourself. Another way of getting those precious information is by asking and learning it from experience executives and engineers.
I've been working for almost three years in my current work place and I observed all these problems. I think it might be useful if I share all those plant problems with you guys. There are a lot of problems and I shall post it in this blog from time to time. The problems varies and comes from various angles and areas such as (without any particular arrangement):
1. Utilities problems :
power, natural gas, steam, water, chemicals, LFO, diesel, processing aid, air etc. Processing cost can increase the overall production cost.
2. Maintenance & Equipment problems :
Pump, piping, instrumentation, pressure transmitter, level transmitter, temperature indicator, NPSH, cavitation, control valve, steam trap, leakage, insulation.
3. Human resource problems :
Disciplinary, Late coming, absent, failure to obey instruction, negligence, psychology.
4. Report & Documentation problems :
Daily report, monthly report, quarterly report, yearly report, ISO & GMP related documents.
5. Communication problems :
Miscommunication, instruction, network, PC, server, bad relationship with up line, down line and colleagues.
6. Quality problems :
Laboratory, lab checking, quality control, testing error, solution/chemical contamination.
7. Supplier problems :
Raw material - product - goods out of spec, cheating.
8. Supporting equipment problems :
Deterioration of cooling tower performance, heat exchanger performance.
9. Planning problems :
Administration interruption, supply demand, market, margin.
10. Control system problems :
Supervisor Control and Data Acquisition (SCADA), Human machine interface (HMI) and PC, IT, network, softwares.
11. Stock, raw material, storage tank problems :
Network, false information, over flow, insufficient storage tank, contamination.
12. Stress, Pressure & Health Problems :
Meeting deadline, lack of time, inadequate knowledge, 24 hours alert and standby, meetings, reports, various crisis, inability to manage pressure from top management.
OK. That would be some very general and surface introduction on what problems we can expect from running a plant. I'll try to update and add more on those details from time to time. I welcome anybody who want to share problems that they faced in their plant. We can discuss it here and share it with the rest of the readers.